PPWR: 10 days to provide documentation during an inspection. How to prepare your company

When an authority asks, you have 10 calendar days to show technical documentation, the declaration of conformity and supplier data. See what has to be ready in advance.

PPWR: 10 days to provide documentation during an inspection. How to prepare your company

The PPWR, Regulation (EU) 2025/40, has applied since 12 August 2026. It changes not only what packaging must meet, but also how a company has to prove it. During an inspection what counts is what you can show on paper, and there is little time to respond.

Why the 10-day rule matters

When a market surveillance authority asks for documents on a specific packaging, the company has 10 calendar days to respond. That is too short to start writing documentation then. The 10 days are really a test of how well organised the company is. The authority may ask for:

  • technical documentation under Annex VII,
  • the EU declaration of conformity (Annex VIII),
  • evidence that the requirements are met,
  • data on the packaging's suppliers and recipients (Article 22).

If documents sit in different departments, are outdated or incomplete, the company is not ready for an inspection, even when the packaging itself meets the technical parameters.

PPWR technical documentation: the foundation of compliance

Technical documentation is a structured document tied to a specific packaging, not a folder of loose files. It should cover:

  • a description of the packaging and its purpose,
  • design documentation,
  • material composition and component information,
  • a list of standards and technical specifications applied,
  • test reports,
  • a non-compliance risk analysis,
  • a description of how compliance is demonstrated.

It is prepared before the packaging is placed on the market and must be updated whenever the material, design, supplier or specification changes.

Traceability: a new supply-chain obligation

A company must be able to say who supplied it with packaging or packaged products and to whom it passed them on. This data is kept for 5 years for single-use packaging and 10 years for reusable packaging. In practice that means joining information from purchasing, quality, logistics, R&D and compliance, which often live in separate systems.

PFAS: new limits from 12 August 2026

PFAS are used, among other things, in grease-resistant coatings and barrier layers. Food-contact packaging is now subject to these limits:

  • 25 ppb for any single PFAS substance,
  • 250 ppb for the sum of PFAS,
  • 50 ppm for total fluorine, including polymeric PFAS.

The limits apply to every layer of the packaging, including intermediate ones. Companies therefore need detailed material data and test results from suppliers, reflected in their technical documentation and declarations of conformity.

Formal non-compliance: an often underestimated risk

Packaging can fail the PPWR not because of its parameters but because of paperwork: missing or incomplete documentation, a wrong declaration of conformity or missing supplier data. The authority may then:

  • restrict making the packaging available on the market,
  • prohibit making it available,
  • order its withdrawal or recall from the market.

How to prepare for the 10-day rule

Readiness is not knowing the rules but being able to prove compliance quickly. A good test is whether the company can answer four questions straight away:

  1. Which packaging does the request concern?
  2. Which PPWR requirements apply to it?
  3. Where is the evidence of compliance?
  4. Is the documentation up to date?

If any answer means digging through emails and drives, it is worth sorting out now. For the deadlines, see our complete PPWR guide.

Conclusion: you must be able to prove compliance

The PPWR shifts the focus from meeting requirements to being able to document them. Documentation should exist in advance, be tied to specific packaging, be kept up to date and be available without rebuilding it during an inspection. In a PPWR audit we check which data and documents are missing and what to put in order before a request arrives.